Odeon Cinema – Hull
November 10, 2017

The Odeon Cinema at Hull required a major review of the efficiency of their air conditioning system. Glidefield were commissioned to undertake the project which included, suppling the Air Handling Units and craning into position on to the rooftop and installing all the gas pipework. The roof ductwork to the cinema areas was also designed, manufactured and installed by Glidefield.
No Responses