Our projects
Client: Colt Data Centres Glidefield supplied and installed P3 Ductal Care Range of 30mm pre-insulated ductwork including installation of free plant to data halls 21 through to 30. On average the installation took 8 weeks per hall with a contract value of £250,000 per hall. Main Contractors: ESG & Metnor Construction
Odeon Cinema – Hull
The Odeon Cinema at Hull required a major review of the efficiency of their air conditioning system. Glidefield were commissioned to undertake the project which included, suppling the Air Handling Units and craning into position on to the rooftop and installing all the gas pipework. The roof ductwork to the cinema areas was also designed, […]
Leeds Primary Care Trust
Halton, Holt Park & Rothwell Medical CentresThe design and build project consisted of a phased refurbishment programme of 3 existing medical centres. The works were executed over a compressed working programme to minimise inconvenience and disruption to critical operations of the centres.
Holiday Inn, Commercial Road, London
The design and build of a new six floor core brand Holiday Inn Hotel with 133 bedrooms, restaurant, meeting and conference room facilities. Glidefield were involved from early design stages and progressed through detailed design to completion of the project in July 2012.
Montagu Hospital
A state-of-the-art Rehabilitation Centre, believed to be the first of its kind in the UK, provides care for people recovering from serious illness or injury. The unit opened in the summer of 2013. Glidefield undertook the full building services systems installations.
Princes Food Limited
Provision of Mechanical & Electrical services to provide the new Production Storage Warehouse and Welfare building for Princes Foods Limited. Works carried out on a design and build basis in association with Vinci Construction UK Limited.
Trafford Centre, Manchester
R22 change out programme – Removal of existing roof top package units, modification and retrofitting of existing electrical units and duct work. All works undertaken at night to minimise interruption to retail clients in the centre.
Travelodge, Bradford
The design and build of a 69 bedroom hotel in the centre of Bradford adding to Glidefield 13+ year working with Travelodge.
Travelodge, Enfield
The design and build of a 130 bedroom hotel incorporating connection onto site ‘Energy Centre’ with stand alone back up plant for heating and hot water systems.
McArthur Glen Shopping Centres
Swindon, Cheshire Oaks, Bridgend, East Midlands & YorkSwindon – Replacement of existing heat pump units within retail outlets – retrofit to existing pipework/ductwork.Cheshire Oaks, York, East Midlands and Bridgend – Roof top changeout programme removing of existing plant and equipment, modification and retro-fitting of new equipment. All works carried out on a 24/7 basis to […]
London Southend Airport Hotel – Holiday Inn
The design and build of a new core brand Holiday Inn with 129 bedrooms, conference and meeting room facilities along with ground floor bar area and rooftop 1935 restaurant offering fantastic panoramic views across the essex countryside and southend airport.